{"id":7020,"date":"2025-06-27T17:38:47","date_gmt":"2025-06-27T09:38:47","guid":{"rendered":"https:\/\/www.wtauserver.com\/?p=7020"},"modified":"2025-06-27T17:38:47","modified_gmt":"2025-06-27T09:38:47","slug":"nuclear-power-construction-safety","status":"publish","type":"post","link":"https:\/\/www.wtauserver.com\/en\/nuclear-power-construction-safety\/","title":{"rendered":"Cracking the safety problem of nuclear power construction: the landing of an active anti-collision system for autonomous nuclear power projects"},"content":{"rendered":"<p class=\"ds-markdown-paragraph\">In the construction of a 100 billion-level nuclear power project in our country, micro-technology research and development<strong>Crane active anti-collision system<\/strong>Successfully applied to the construction of 6 million kilowatt nuclear power units. Facing complex scenarios such as intensive cross-operation of large-scale equipment and collaborative operation of high-altitude tower cranes, the system uses<strong>Zero-error early warning, multi-device joint defense, portable deployment<\/strong>The three core technologies set a new standard for the safety of nuclear power construction.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-7022\" src=\"https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/2-6.webp\" alt=\"Anti-collision early warning system\" width=\"1080\" height=\"582\" srcset=\"https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/2-6.webp 1080w, https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/2-6-300x162.webp 300w, https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/2-6-1024x552.webp 1024w, https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/2-6-768x414.webp 768w, https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/2-6-18x10.webp 18w\" sizes=\"auto, (max-width: 1080px) 100vw, 1080px\" \/><\/p>\n<hr \/>\n<h2>Four major safety challenges and solutions for Nuclear power construction<\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-7023\" src=\"https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/4.jpg\" alt=\"Anti-collision early warning system\" width=\"1080\" height=\"810\" srcset=\"https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/4.jpg 1080w, https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/4-300x225.jpg 300w, https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/4-1024x768.jpg 1024w, https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/4-768x576.jpg 768w, https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/4-16x12.jpg 16w\" sizes=\"auto, (max-width: 1080px) 100vw, 1080px\" \/><\/p>\n<h4>Challenge 1: The risk of collision in the three-dimensional space of the group of towers<\/h4>\n<p class=\"ds-markdown-paragraph\"><strong>Solution: Intelligent joint defense technology for high and low towers<\/strong><\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\">Real-time scanning of the three-dimensional operation trajectory of the tower crane<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\">Millisecond-level prediction of collision risk and automatic early warning<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\">Ensure zero collision construction of high-altitude dense tower groups<\/p>\n<\/li>\n<\/ul>\n<h4>Challenge 2: Hidden dangers of cross-intrusion of multiple devices<\/h4>\n<p class=\"ds-markdown-paragraph\"><strong>Solution: Collaborative protection network for all equipment<\/strong><\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\">Synchronous identification of mobile devices such as crawler cranes and car cranes<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\">Dynamically delineate the restricted area for tower crane safety protection<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\">Prevent heavy equipment collision and overturning accidents<\/p>\n<\/li>\n<\/ul>\n<h4>Challenge three: Long-term accuracy guarantee for nuclear power construction<\/h4>\n<p class=\"ds-markdown-paragraph\"><strong>Solution: Self-developed anti-cumulative error algorithm<\/strong><\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\">Calibration-free continuous operation after installation<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\">Centimeter-level positioning accuracy (error &lt;\u00b13cm)<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\">Adapt to the 5+year construction cycle of nuclear power construction<\/p>\n<\/li>\n<\/ul>\n<h4>Challenge four: the need for multi-unit migration and multiplexing<\/h4>\n<p class=\"ds-markdown-paragraph\"><strong>Solution: Modular portable system<\/strong><\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\">Quick disassembly and assembly and migration to the new unit site<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\">Save 30% on safety management costs<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\">Support the rolling construction of multi-unit nuclear power plants<\/p>\n<\/li>\n<\/ul>\n<hr \/>\n<h2>Why did the nuclear power project choose an active anti-collision system?<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-7021\" src=\"https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/1-8.webp\" alt=\"Nuclear power construction\" width=\"1080\" height=\"565\" srcset=\"https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/1-8.webp 1080w, https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/1-8-300x157.webp 300w, https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/1-8-1024x536.webp 1024w, https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/1-8-768x402.webp 768w, https:\/\/www.wtauserver.com\/wp-content\/uploads\/2025\/06\/1-8-18x9.webp 18w\" sizes=\"auto, (max-width: 1080px) 100vw, 1080px\" \/><\/h2>\n<ol start=\"1\">\n<li>\n<p class=\"ds-markdown-paragraph\"><strong>Comply with nuclear safety regulations<\/strong>: Meet the safety standards of the International Atomic Energy Agency for the construction of nuclear facilities<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong>Cope with complex scenarios<\/strong>: Solve the problem of collaboration of 8+ types of equipment in narrow sites<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong>Full cycle reliability<\/strong>: Verified by extreme working conditions such as typhoons, high humidity, electromagnetic interference, etc.<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong>Economic benefits doubled<\/strong>: A single project reduces the loss of safety downtime by more than 10 million<\/p>\n<\/li>\n<\/ol>\n<hr \/>\n<h3>Industry application empirical evidence<\/h3>\n<p class=\"ds-markdown-paragraph\">The system has been successfully installed<strong>Hualong No. 1<\/strong>\u3001<strong>Guohe No. 1<\/strong>And other independent nuclear power projects, accumulated\uff1a<br \/>\n\ufe0f\ufe0f Eliminate the hidden dangers of high-risk collisions 427 times<br \/>\n\ufe0f\ufe0f Improve the efficiency of hoisting operations by 40%<br \/>\n\ufe0f Guarantee 2000+days of safe construction<\/p>\n<hr \/>\n<h2 class=\"ds-markdown-paragraph\"><strong>Conclusion: The technological revolution in the Safe construction of nuclear power<\/strong><\/h2>\n<p class=\"ds-markdown-paragraph\">The active anti-collision system of the micro-special crane is used to<strong>Military-grade accuracy<\/strong>and<strong>Intelligent joint defense technology<\/strong>, Redefine the safety management standards of nuclear power projects. With the large-scale application of this system in newly built nuclear power units, China&#039;s nuclear power construction is entering a new era of \u201czero collision accidents\u201d.<\/p>","protected":false},"excerpt":{"rendered":"<p>In the construction of a nuclear power project worth hundreds of billions of yuan in our country, the crane active anti-collision system developed by Weite Technology was successfully applied to the construction of six 1 million kilowatt-level nuclear power units. Facing large-scale [...]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[140],"tags":[],"class_list":["post-7020","post","type-post","status-publish","format-standard","hentry","category-nuclear-power-construction"],"_links":{"self":[{"href":"https:\/\/www.wtauserver.com\/en\/wp-json\/wp\/v2\/posts\/7020","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wtauserver.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wtauserver.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wtauserver.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wtauserver.com\/en\/wp-json\/wp\/v2\/comments?post=7020"}],"version-history":[{"count":0,"href":"https:\/\/www.wtauserver.com\/en\/wp-json\/wp\/v2\/posts\/7020\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.wtauserver.com\/en\/wp-json\/wp\/v2\/media?parent=7020"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wtauserver.com\/en\/wp-json\/wp\/v2\/categories?post=7020"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wtauserver.com\/en\/wp-json\/wp\/v2\/tags?post=7020"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}